P. Wolfe, The implications of an increasingly decentralised energy system, Energy Policy, vol.36, issue.12, pp.4509-4513, 2008.
DOI : 10.1016/j.enpol.2008.09.021

J. Mcdonald, Adaptive intelligent power systems: Active distribution networks, Energy Policy, vol.36, issue.12, pp.4346-4351, 2008.
DOI : 10.1016/j.enpol.2008.09.038

T. J. Hammons, Integrating renewable energy sources into European grids, International Journal of Electrical Power & Energy Systems, vol.30, issue.8, pp.462-475, 2008.
DOI : 10.1016/j.ijepes.2008.04.010

B. Fardanesh and E. F. Richards, Distribution system production with decentralized generation introduction into the system, IEEE Transactions on Industry Applications, vol.20, pp.122-130, 1984.

R. C. Dugan and D. T. Rizy, Electric distribution protection problems associated interconnection of small, dispersed generation devises, IEEE Transactions on Power Apparatus and Systems, vol.103, pp.1121-1127, 1984.

D. T. Rizy, W. T. Jewell, and J. P. Stovall, Operational and design consideration for electric distribution systems with dispersed storage and generation (DSG), IEEE Transactions on Power Apparatus and Systems, vol.104, pp.2864-2871, 1985.

N. Jenkins, Embedded generation, Power Engineering Journal, vol.9, pp.145-150, 1995.
DOI : 10.1049/PBPO031E

H. Lund and E. Münster, Management of surplus electricity-production from a fluctuating renewable-energy source, Applied Energy, vol.76, issue.1-3, pp.65-74, 2003.
DOI : 10.1016/S0306-2619(03)00048-5

R. Niemi and P. D. Lund, Decentralized electricity system sizing and placement in distribution networks, Applied Energy, vol.87, issue.6, pp.1865-1869, 2010.
DOI : 10.1016/j.apenergy.2009.11.002

H. B. Lee, S. E. Chase, and R. C. Dugan, Overvoltage considerations for interconnecting dispersed generators with wye-grounded distribution feeders, IEEE Transactions on Power Apparatus and Systems, vol.104, pp.3587-3594, 1984.

W. Zhang and A. Feliachi, Residential load control through real-time pricing signals, Proceedings of the 35th Southeastern Symposium on System Theory, 2003., pp.89-92, 2003.
DOI : 10.1109/SSST.2003.1194571

P. Yilmaz, M. H. Hocaoglu, and A. E. Konukmanc, A pre-feasibility case study on integrated resource planning including renewables, Energy Policy, vol.36, issue.3, pp.1223-1232, 2008.
DOI : 10.1016/j.enpol.2007.12.007

H. Lund and B. V. Mathiesen, Energy system analysis of 100% renewable energy systems???The case of Denmark in years 2030 and 2050, Energy, vol.34, issue.5, pp.524-531, 2009.
DOI : 10.1016/j.energy.2008.04.003

E. Spiegel and N. Mcarthur, Energy Shift: Game-Changing Options for Fueling the Future, 2009.

B. Paris, J. Eynard, S. Grieu, T. Talbert, and M. Polit, Heating control schemes for energy management in buildings, Energy and Buildings, vol.42, issue.10, pp.1908-1917, 2010.
DOI : 10.1016/j.enbuild.2010.05.027

URL : https://hal.archives-ouvertes.fr/hal-00543272

B. K. Sovacool, The intermittency of wind, solar, and renewable electricity generators: Technical barrier or rhetorical excuse?, Utilities Policy, vol.17, issue.3-4, pp.288-296, 2009.
DOI : 10.1016/j.jup.2008.07.001

T. Bradford, Solar Revolution, The Economic Transformation of the Golbal Energy Industry, 2006.

J. V. Paatero and P. D. Lund, Effects of large-scale photovoltaic power integration on electricity distribution networks, Renewable Energy, vol.32, issue.2, pp.216-234, 2007.
DOI : 10.1016/j.renene.2006.01.005

H. Camblong, J. Sarr, A. T. Niang, O. Curea, J. A. Alzola et al., Micro-grids project, Part 1: Analysis of rural electrification with high content of renewable energy sources in Senegal, Renewable Energy, vol.34, issue.10, pp.34-2141, 2009.
DOI : 10.1016/j.renene.2009.01.015

A. Peacock, D. Jenkins, M. Ahadzi, A. Berry, and S. Turan, Micro wind turbines in the UK domestic sector, Energy and Buildings, vol.40, issue.7, pp.1324-1333, 2008.
DOI : 10.1016/j.enbuild.2007.12.004

D. B. Botkin and D. Perez, Powering the future, A Scientist's Guide to Energy Independence, 2010.

I. Hadjipaschalis, A. Poullikkas, and V. Efthimiou, Overview of current and future energy storage technologies for electric power applications, Renewable and Sustainable Energy Reviews, vol.13, issue.6-7, pp.1513-1522, 2009.
DOI : 10.1016/j.rser.2008.09.028

A. S. Bahaj, L. Myers, and P. A. James, Urban energy generation: Influence of micro-wind turbine output on electricity consumption in buildings, Energy and Buildings, vol.39, issue.2, pp.154-165, 2007.
DOI : 10.1016/j.enbuild.2006.06.001

B. Paris, J. Eynard, S. Grieu, and M. Polit, Hybrid PID-fuzzy control scheme for managing energy resources in buildings, Applied Soft Computing, vol.11, issue.8, pp.5068-5080, 2011.
DOI : 10.1016/j.asoc.2011.05.052

URL : https://hal.archives-ouvertes.fr/hal-00628879

M. Salvador and S. Grieu, Evaluation and minimization of the energy impact of typical Enropean buildings on the electricity grid: a simulation case study, Building Simulation, 2011.

P. A. Østergaard, Reviewing optimisation criteria for energy systems analyses of renewable energy integration, Energy, vol.34, issue.9, pp.1236-1245, 2009.
DOI : 10.1016/j.energy.2009.05.004

G. Cerutti, Rapport annuel de la Direction Générale de la Concurrence, de la Consommation et de la Répression des Fraudes, Ministère de l'Economie, des Finances et de l'Industrie, 2006.

S. Polley, Understanding the building regulations, 2009.

B. Paris, J. Eynard, M. Salvador, and S. Grieu, Fuzzy logic as a useful tool for managing resources in multi-energy buildings, EUSFLAT-LFA 2011, 2011.

L. A. Zadeh, Fuzzy sets, Information and Control, vol.8, issue.3, pp.338-353, 1965.
DOI : 10.1016/S0019-9958(65)90241-X

S. R. Huang, C. Y. Lin, C. C. Wu, and S. J. Yang, The application of Fuzzy controller for fuel cell generating studies, International Journal of Hydrogen Energy, vol.33, issue.19, pp.5205-5217, 2008.
DOI : 10.1016/j.ijhydene.2008.05.018

A. Traoré, S. Grieu, S. Puig, L. Corominas, F. Thiéry et al., Fuzzy control of dissolved oxygen in a sequencing batch reactor pilot plant, Chemical Engineering Journal, vol.111, issue.1, pp.13-19, 2005.
DOI : 10.1016/j.cej.2005.05.004

A. Traoré, S. Grieu, F. Thiéry, M. Polit, and J. Colprim, Control of sludge height in a secondary settler using fuzzy algorithms, Computers & Chemical Engineering, vol.30, issue.8, pp.1235-1242, 2006.
DOI : 10.1016/j.compchemeng.2006.02.020

C. Wakabayashi, M. Embiruçu, C. Fontes, and R. Kalid, Fuzzy control of a nylon polymerization semi-batch reactor, Fuzzy Sets and Systems, pp.537-553, 2009.

H. B. Verbruggen and P. M. Brujin, Fuzzy control and conventional control: What is (and can be) the real contribution of fuzzy systems?, Fuzzy Sets and Systems, pp.151-160, 1997.

R. H. Byrd, N. I. Gould, J. Nocedal, and R. A. Waltz, An algorithm for non-linear optimization using linear programming and equality constrained subproblems, Mathematical Programming, vol.100, issue.1, pp.27-48, 2004.

R. Fletcher and S. Leyffer, Nonlinear programming without a penalty function, Mathematical programming 91, pp.239-269, 2002.
DOI : 10.1007/s101070100244

P. Spellucci, An SQP method for general nonlinear programs using only equality constrained subproblems, Mathematical Programming, vol.23, issue.3, pp.413-448, 1998.
DOI : 10.1007/BF01580078

P. T. Boggs and J. W. Tolle, Sequential Quadratic Programming, Sequential quadratic programming, pp.1-51, 1995.
DOI : 10.1007/BF01580366

N. I. Gould, D. Orban, and P. L. Toint, Numerical methods for large-scale nonlinear optimization, Acta Numerica, vol.14, pp.299-361, 2005.
DOI : 10.1017/S0962492904000248

D. Rew, H. J. Kelley, and E. M. Cliff, A computational study of active-set logics for nonlinear programming, Annual Review in Automatic Programming, vol.13, issue.2, pp.157-170, 1985.
DOI : 10.1016/0066-4138(85)90477-X

Y. Ji, K. C. Zhang, S. J. Qu, and Y. Zhou, A trust-region method by active-set strategy for general nonlinear optimization, Computers & Mathematics with Applications, vol.54, issue.2, pp.229-241, 2007.
DOI : 10.1016/j.camwa.2007.02.003

R. Fletcher and E. Sainz-de-la-maza, Nonlinear programming and nonsmooth optimization by successive linear programming, Mathematical Programming, vol.32, issue.1-3, pp.235-256, 1989.
DOI : 10.1007/BF01582292